Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/061Models:Pier-HV-IPIST-HV-IPILCOR-HV-IPIRCOR-HV-IPIIn the C
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0610Part number list on following page.7 Log Assembly(NG, LP)
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0611Service Parts List (NG, LP)IMPORTANT: THIS IS DATED INFO
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0612(NG, LP) Exploded Parts DiagramService PartsL&RCOR-H
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0613Appliance CertificationThe Heat & Glo fireplace mode
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0614For all side wall horizontally vented gas fueled equipmen
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06152Getting StartedIntroducing the Heat & Glo Gas Firep
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0616Figure 1. Diagram of the PIER-HV-IPI5-1/4(133mm)1/2(13mm)
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0617Figure 2. Diagram of the ST-HV-IPI5-14(133mm)12(306mm)1/
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0618Figure 3. Diagram of the LCOR-HV-IPI and RCOR-HV-IPI5-1/4
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06193Installing the FireplaceStep 1. Locating the Fireplace
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/062These units MUST use one of the vent systemsdescribed in t
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0620Minimum Clearances from the Fireplace to Combustible Mate
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0621Framing should beconstructed of 2 X 4lumber or heavier.M
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0622NOTE: PIPES OVERLAP 1-1/4 INCHESAT EACH JOINT.Figure 6.
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0623Figure 7. Vent System Components and Termination KitsSte
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0624Figure 8NOTE: On vertical ventingconfigurations you maywa
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0625Figure 14. Venting with One 90° ElbowFigure 13. Venting
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0626Figure 15. Venting with Two 90° ElbowsH1HVVV1HNATURAL GAS
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0627Figure 16.Venting with Two 90° ElbowsFigure 17. Venting
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0628Figure 18. Venting with three 90° elbowsHH1H2V HVH1V1NA
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0629Figure 19. Venting with three 90° elbowsVHH1V1VHH1V 1NAT
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/063Table of ContentsSafety and Warning Information...
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06301. Attach the First Vent Component to the Starting Coll
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06314. Install FirestopsFor Horizontal Runs - Firestops are
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0632Figure 26. Ceiling Firestop (Ceiling Side)If the area ab
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0633V= VENT TERMINALX= AIR SUPPLY INLET= AREA WHERE TERMINA
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0634For Vertical Terminations - To locate the vent and instal
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0635Step 4. Positioning, Leveling, and Securingthe Fireplac
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0636• Insert insulation from the outside of the fireplace and
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0637Step 8. Wiring the FireplaceNOTE: Electrical wiring mus
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0638Wall SwitchPosition the wall switch in the desired positi
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0639If the box is being wired to a wall mounted switch for u
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0646 Log Assembly(NG, LP) Exploded Parts DiagramService Part
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0640Step 9. FinishingFigures 39 and 40 show the minimum vert
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0641Installing the TrimCombustible materials may be brought
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0642Now the Lava rock can be applied (see Figure 45).Figure 4
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0643Placing the Ember MaterialEmber material is shipped with
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/0644Step 11. Before Lighting the FireplaceBefore lighting t
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/06454Maintaining and Servicing Your FireplaceFireplace Maint
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/065AVAIL AB LETO SHIP IN 24HOURSITEM DESCRIPTION SERIAL # PA
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/066(NG, LP) Exploded Parts DiagramService PartsST-HV-IPIBegi
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/067AVAILABLE TOSHIP IN 24HOURSITEM DESCRIPTION SERIAL # PART
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/068Part number list on following page.7 Log Assembly15(NG, LP
Heat & Glo • PIER-HV-IPI, ST-HV-IPI, L&R-COR-HV-IPI • 2005-900 Rev. K • 11/069AVAILABLE TOSHIP IN 24HOURSITEM COMMON PARTS SERIAL # PA